Jiangsu, China
Business Type:
Manufacturer/Factory
Main Products:
Number of Employees:
41.0
Year of Establishment:
2002-08-14
Management System Certification:
ISO 9001, ISO 20000
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workdays
OEM/ODM Service
Sample Available

Blow Molding Machine, Molding Machine, Extrusion Blow Molding Machine manufacturer / supplier in China, offering 160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment, 25L~50L PE Jerry Cans Blow Moulding Machine, 20L 30L 50L 60liter Jerry Cans Plastic Blow Moulding Machine and so on.

Diamond Member Since 2015
Audited Supplier
  • 160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment
  • 160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment
  • 160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment
  • 160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment
  • 160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment
  • 160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment

160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $10,000-70,000/ Piece
Port: Shanghai, China
Production Capacity: 100PCS/Year
Payment Terms: L/C, T/T, Western Union, Paypal
Type: Extrusion Blow Molding Machine
Raw Material: HDPE
Making Method of Parison: Extrusion-Blow Molding
Automation: Automatic
Computerized: Computerized
Max. Product Volume: 230L

You Might Also Like

Loading...

Basic Info

Model NO.
KST100N
Screw Diameter
150mm
Controller
PLC&Moog&Italy Geferan
Hydraulic System
Japan Yuken
Trademark
KASTER
Transport Package
Film Packing/Container
Specification
160L
Origin
China
HS Code
8477300000

160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment160L~250L HDPE Drum/Tank/Bottle Blow Molding Machine Equipment
Extruder 
1Screw diameter100mm
2L/D ratio24:1
3Screw speed1500r.p.m.
4Drive motorAC 45Kw 3 Phase asynchronism motor
5 Inveting driveEmerson,America
6Heating zone with cooling fan3 ZONES
7Output/Throughout140Kg/h(ABS  particle)
8Heating capacity3X5(=15) kw
9Vertical adjustment of head300mm
10Right/Left adjustment of head20mm
11Groove feed barrel cylinderNO
12Gear boxHard gear decelerator
13Safety precautionSafety door and Safety switch
DIE HEAD 
1Accumulation capacity20L(14kgs)
2DesignFirst in, first out
3Heating zone4 ZONES
4Heating capacity20kw
5Max die&pin diameter450mm
6Die head axis with pre-blow¢12mm
CLAMPING UNIT 
1Tie barDouble diagonal tie bar style
2Platen size1100(W)X1400(H)
3Size of mold900*1400mm
4Clamping force500-780KN
5Close/Open stroke600-1400mm
6Mold thickness620mm
7Clamping stroke measurementGerfran Transducer 
8High pressure12MPa
9Support parts for platen movementMoving and clamping axis
HYDRAULIC SYSTEM 
1Drive motorAC15Kw 3 Phase asynchronism motor
2Hydraulic  valveYUKEN,TAIWAN
3Hydraulic pumpYeoshe
4Connector,TuberJapan
5SealJapan VALQUA
6Oil tank capacity280L
7Operating pressure≤12MPa
8Cooling water for oilfixed
9Control of oil level & temperatureChecking oil temperature and abnormal alert
be observed dipstick
 
PNEUMATIC SYSTEM 
1Operating pressure18MPa
2Blow pressure0.8MPa
3Needle blow circuitHigh & Low pressure Controlling
PARISON CONTROL 
1ProgrammerJapan MOOG or Italy Gerfran
2Servo valveGerman Rexoth
3Servo cylinderBelong to the die head
4Hydraulic packVariable plunger pump  Tai Wan
 

Customer Service
 

DELIVERY:  Delivery 45~60 days from order and deposit.

TRAINNING
The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;

INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer's factory. After one week,if the Buyer still needs the training, $100 should be paid for the engineer.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's food & board while installation in buyer's factory.And the Buyer should also pay for the air ticket for the engineer.

GUARANTEE 
The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.

Send your message to this supplier

*From:
*To:
avatar Ms. Manee
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now